These days, new chemical projects or those undergoing expansion are being built everywhere, both abroad and at home. Logically, the development of any project follows a reasonable process and timeline. However, due to the political goals of investors, societal considerations, or even financial pressures, this reasonable construction period is constantly shortened. Is this a good thing? Why? We welcome active discussions from everyone. @kyr @tgfyikndaxcbj @A Poet oh @WiseOne @2072450571 @bxzangblzjel
My understanding includes the current projects; everyone is emphasizing the importance of a reasonable project timeline, as it’s not about making arrangements in an entirely unscientific manner. Especially the accident at the Fengcheng Power Plant has had a significant impact on us
Tell me in detail your feelings and opinions
A reasonable timeline is the one specified in the regulations for carrying out construction tasks in stages. When the owner keeps trying to shorten the construction period, action must indeed be taken to address this issue; for unreasonable timelines, the relevant departments should intervene and make adjustments during the project evaluation process
It is not impossible to shorten the project timeline, but doing so does not mean reducing the number of steps, shortening certain procedures, or cutting back on the inherent time required. The project timeline can be shortened by finding solutions through proper design and by assigning more personnel to accelerate the design process; The construction timeline can be shortened by finding solutions in the installation process; more workers can be assigned to the task, or even shifts can be arranged to work back-to-back in order to reduce the construction period