Thread Content
A quality acceptance meeting for the thermal power installation of the Yanzhou Coal Yulin Energy Chemical Project was held. Author/Source: Sinochem 16th Construction Company; Date: 2020-08-18; Clicks: 3. Recently, the thermal power installation for the 500,000 tons per year polymethoxymethane production project of Yanzhou Coal Yulin Energy Chemical Co., Ltd., which is being constructed by the Northwest Branch, entered the phase of quality acceptance for individual projects. Various parties including the general contractor, surveyors, supervisors, designers, construction teams, and the provincial quality inspection center jointly held a quality acceptance meeting for this project (covering civil works and the 30MW steam turbine generator set used for waste heat power generation, with inspections prior to its commercial operation). Our team’s project passed the acceptance test on the first attempt. This acceptance process involves 9 civil engineering sub-projects, as well as 10 sub-projects related to the installation of steam turbine generators and electrical instrumentation. This acceptance process is divided into two parts: the inspection of quality documents and the on-site inspection of the physical structure. The inspections are carried out in accordance with current **standards, industry regulations, and local rules regarding construction in Shaanxi Province. The Chemical Industry Engineering Quality Supervision Center and the Shaanxi Electric Power Construction Engineering Quality Supervision Center are invited to oversee the entire process on site, ensuring that the inspections are conducted in a scientific, reasonable, and lawful manner.