HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

The special seminar on the plant-wide system and process plan for Yulin Chemical’s 15 million tons per year project for advanced processing of coal by grade was successfully held

2020-09-15View Original

Thread Content

A special seminar on the plant-wide system and process plans for the 15 million tons per year project for the advanced processing of coal in different grades at Shaanxi Coal Group Yulin Chemical was successfully held. Author/Source: Shaanxi Coal Group Yulin Chemical Company. Date: 2020-09-15. Views: 22. From September 10th to 11th, a special seminar on the plant-wide system and process plans for the project aimed at the clean and efficient conversion of coal in different grades at a rate of 15 million tons per year, including the production of olefins, aromatics, and other products, was held in Yulin by Shaanxi Coal Group Yulin Chemical Company (hereinafter referred to as “the Company”). The conference invited ten senior industry experts to discuss the relevant topics. Wang Huimin, Deputy Secretary of the Party Committee and General Manager of the company, Du Sanmin, Member of the Party Committee and Deputy General Manager, Vice General Managers Wang Weifeng and Zheng Baoxiang, Chief Engineer Liu Wansheng, as well as representatives from design institutes and environmental assessment and safety evaluation agencies such as China Chengda Engineering Co., Ltd., Donghua Engineering Technology Co., Ltd., Sinopec Luoyang Engineering Co., Ltd., and Sinopec Engineering Construction Co., Ltd., attended the meeting. During the meeting, various design institutes presented their technical proposals regarding the plant’s overall process flow, coal chemical units, MTO and coal pyrolysis-related facilities, as well as olefins, aromatics and related downstream units. Subsequently, the experts present conducted in-depth discussions on the plant’s product portfolio, system configuration, the technical specifications of each unit, and their scale, offering valuable suggestions and recommendations. Upon the completion of the discussion, the company stated that it would carefully consider the experts’ suggestions and opinions, clarify the overall design approach, finalize the product manufacturing processes and system configurations for the entire plant, establish relevant task forces, and carry out thorough technical evaluations for the first and second phases of Phase 1 as well as the first and second phases of Phase 2, in order to lay a solid foundation for the efficient progress of the overall design. At the same time, various design institutes have stated that they will fully cooperate with the client to accelerate the work process, take expert opinions into account to swiftly advance the overall design, and ensure that the overall design for the advanced processing of coal is completed on time and to a high standard.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.