Thread Content
Inner Mongolia’s coal-based ethylene glycol manufacturers to build a 100,000-ton/year DMC plant. Author/Source: Coal-Based New Materials. Date: 2021-02-01. Clicks: 10. On January 26, Tongliao Jinmei Chemical Co., Ltd. announced the public consultation prior to the approval process for its 100,000-ton/year dimethyl carbonate (DMC) production project. Tongliao Jinmei Chemical Co., Ltd. currently has an annual production capacity of 140,000 tons of ethylene glycol and 180,000 tons of oxalic acid. As the oxalic acid products manufactured by this company have gained recognition in the market, it has decided to expand its oxalic acid production capacity while reducing the output of ethylene glycol. The company plans to invest 100 million yuan to build a new facility within its existing plant site, with an annual production capacity of 100,000 tons of dimethyl carbonate; 2,000 tons of dimethyl oxalate will be produced as a by-product. This project uses methanol and CO produced on-site as raw materials to add an annual production capacity of 100,000 tons of DMC. Once completed, the overall production capacity of the plant will be adjusted based on actual market demand, while keeping the coal consumption constant; the additional production volume for DMC will be 100,000 tons per year, with the production volumes of other products remaining unchanged at 14 tons per year for ethylene glycol, 80,000 tons per year for oxalic acid, and the same level for glycolic acid. Project Name: Construction of a 100,000-ton/year dimethyl carbonate (DMC) production plant by Tongliao Jinmei Chemical Industry Co., Ltd. Project Owner: Tongliao Jinmei Chemical Industry Co., Ltd. Nature of the project: Renovation and expansion. Construction location: Within the premises of Tongliao Jinmei Chemical Industry Co., Ltd., located in the Tongliao Economic and Technological Development Zone, Horqin District, Tongliao City, Inner Mongolia. The coordinates of the center point of the Jinmei Chemical plant are: 122°10’57.72” east, 43°41’8.85” north. Scope and scale of this construction project: A production facility capable of manufacturing 100,000 tons of dimethyl carbonate (DMC) per year, with 2,000 tons of dimethyl oxalate produced as a by-product. Total investment required: 141,751,500 yuan. Floor area: The floor area of this project is approximately 6,000 m2. Labor quota and working system: The labor quota is 50 people, to be covered by the company’s existing staff. The annual operating time is 800 hours. Both production workers and auxiliary production workers work in a three-shift, two-shift system, with each shift lasting 8 hours