Weihua Group successfully overcomes challenges with No. 1 nitrogen compressor Author/Source: Weihua Group Date: 2022-04-09 Clicks: 11 The two imported nitrogen compressors in the gasification workshop, one in operation and one as a backup, are used to supply high-pressure nitrogen to the high-pressure nitrogen tanks, thereby ensuring the proper operation of the gasification furnace. In late February, a problem arose with the standby 1# nitrogen compressor. The workshop conducted a preliminary inspection, assessment, repair, and restart of the equipment, and identified several issues in the oil system. This is because the machining precision requirements for the components of nitrogen compressors are very high, and the key data related to them is kept confidential. Zhao Qiang, the company’s deputy general manager, attached great importance to the maintenance work of these nitrogen compressors. After gaining a thorough understanding of the actual situation, he proposed that Li Ruicai, the deputy director of the gasification workshop’s equipment team, serve as the leader of a technical team dedicated to carrying out this maintenance work, with members drawn from the gasification workshop, the mechanical repair and manufacturing department, and the production department. The task force searched for relevant domestic and international equipment information, analyzed and summarized the data, designed and manufactured the necessary parts, and attempted to reset the equipment for testing – but failed ; Analyze and summarize again, remanufacture the parts, and reset for testing. And so, it was disassembled and inspected over and over again, trying again and again. “Judging from the current testing results, we are just a little bit away from success; there are still some minor details that have gone unnoticed by us. By identifying them and analyzing them thoroughly, and adopting an attitude of doubting everything – since anything can be questioned – everyone can consider things from different perspectives or try alternative methods of verification. This could lead to unexpected results. As long as we keep working hard, we will surely be able to overcome these challenges! ”Song Guoqing, the company’s deputy chief engineer, encouraged everyone. Faced with these obstacles, the problem-solving team analyzed, summarized, and ruled out various possibilities again and again, eventually determining that the issue must lie in the oil circuit system. With renewed determination, they thoroughly inspected the oil pump, check valves, drain valves, diaphragm, piston, piston rings, and so on, and finally identified and resolved the last two \"hidden\" fault points. On March 31, thanks to the joint efforts of everyone, the 1# nitrogen compressor began to operate normally.