HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Simulation problem of the H2S absorption process in the MEDA competition for chemical engineering design

2017-05-20View Original

Thread Content

I’m asking experts to help figure out how to resolve the issues with the process flow. *** SEVERE ERROR: THE FLOW RATE IN THE FOLLOWING STAGES IS ZERO (VAPOR OR LIQUID FLOW RATE APPROACHES 0). A limit of 0.10000E-04 was set for these flow rates; additionally, a limit of 0.10000E-04 was imposed on the V/L or L/V ratio for those stages. ** ERROR: BLOCK B6 IS NOT IN MASS BALANCE – THE MASS INLET FLOW RATE IS 0.42330676E+01, WHILE THE MASS OUTLET FLOW RATE IS 0.37056817E+01. THE RELATIVE DIFFERENCE IS 0.14231819E+00

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.