Environmental impact assessment approval for Shinzoobang’s fluorine chemical project 2025-11-18 On November 14, the environmental impact assessment approval for Hunan Fubang New Materials Co., Ltd.’s project to expand production capacity by 10,000 tons per year of lithium bisfluorosulfonylimide was issued, and it was made public by the Hengyang Environmental Protection Bureau. The details of the project are as follows: Project name: Project for annual production of 10,000 tons of lithium bisfluorosulfonylimide ; Construction unit: Hunan Fubang New Materials Co., Ltd ; Construction location: Songmu Economic Development Zone, Hengyang, Hunan ; Project investment: 223.183 million yuan ; Project nature: Renovation and expansion ; Construction scale and content: (1) Build a production line with an annual output of 10,000 tons of lithium difluorosulfonylimide, to be implemented in two phases. Phase 1 will involve the construction of a production line with an annual output of 3,000 tons of lithium difluorosulfonylimide along with its supporting facilities, while Phase 2 will cover the construction of a production line with an annual output of 7,000 tons of lithium difluorosulfonylimide and its supporting facilities ; (2) The production process and equipment for the 2,400 tons per year capacity of lithium difluorosulfonylimide, which have been established under the \"4,000 tons per year lithium difluorosulfonylimide expansion project\" (Henghuanfa No. 149), remain unchanged ; The construction of the equipment related to the 1,600 tons/year production capacity that has not yet been built will no longer proceed. (3) The existing 35m incinerator with a processing capacity of 0.8 t/h will be removed; the hazardous waste that was previously sent to this incinerator for disposal is now entirely handed over to qualified entities for treatment. (4) Construct an 1100-meter-long, DN300 fiberglass-based overhead sulfur dioxide transmission line with a transport capacity of 11,000 tons per year (from Fubang to Hengguang), equipped with devices such as toxic gas alarms and transmission fans.
【HaiChuan Safety Discussion】Hidden Dangers Around Us – No inner railing installed on the side of vertical storage tank ladders when the distance between them and the tank wall is greater than 150 mm https://bbs.hcbbs.com/thread-5705621-1-1.html (Source: HaiChuan Chemical Forum)
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – with pictures and texts; everyone is welcome to participate in the discussion: https://bbs.hcbbs.com/thread-5705518-1-1.html (Source: HaiChuan Chemical Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】China-made desalination modules for European methanol projects were officially delivered and shipped, 2829–2025 https://bbs.hcbbs.com/thread-5705395-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】Successful assembly of the DC converter transformer for the world’s first \"sea-land integrated\" flexible DC transmission project from 2025 to 2030 https://bbs.hcbbs.com/thread-5705493-1-1.html (Source: Haichuan Chemical Engineering Forum)
【Ten Years of Rapid Development in Chemical Equipment】Major breakthroughs from 2028 to 2025! Pilot-scale production technology for domestic high-end polyolefin elastomers has passed the evaluation for scientific and technological achievements. https://bbs.hcbbs.com/thread-5705551-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Equipment】2833-2025 – Amazing! Nanjing Engineering’s new construction technology for spherical storage tanks based on full-position automatic welding has been put into large-scale use at Maoming Petrochemical https://bbs.hcbbs.com/thread-5705632-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Equipment】2833-2025 – Amazing! Nanjing Engineering’s new construction technology for spherical storage tanks based on full-position automatic welding has been put into large-scale use at Maoming Petrochemical https://bbs.hcbbs.com/thread-5705632-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
[Common Issues in Haichuan Pipeline Design] – A compilation post; images and text are being updated. Feel free to join the discussion: https://bbs.hcbbs.com/thread-5705828-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Engineering Equipment】The intelligent pipeline welding robot for the period 2834–2025 has been put into use officially. https://bbs.hcbbs.com/thread-5705686-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Engineering Equipment】The intelligent pipeline welding robot for the period 2834–2025 has been put into use officially. https://bbs.hcbbs.com/thread-5705686-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))