HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Is a sewage discharge point required at the loading and unloading yard?

2017-05-24View Original

Thread Content

Do the loading and unloading areas for oil products and chemical products require sewage discharge points? If so, where are they located? What form?
Reply #22017-05-24
This is necessary; small ditches should be installed in the area to collect water at the lowest points.
Reply #32017-05-25
It is necessary; generally, depending on the properties of the material, it is recovered in a sealed manner or discharged into a drain
Reply #42017-05-25
Where is it located at the loading and unloading platform?
Reply #52017-06-23
Circular drainage ditches are installed around the loading and unloading quays, and connected to the sewage system and emergency spill ponds through buried pipes.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.