【Production Version】Daily Question 20180114

2018-01-14View Original

Thread Content

When using manually excavated jacking pipes, the groundwater level should be lowered to at least (  ) below the bottom of the pipes, and measures should be taken to prevent other water sources from entering the jacking pipe system.   A、0.5m   B、2m   C、1.0m   D、1.5m Correct answer: A
Reply #22018-01-14
When using manually excavated jumbo tubes, the groundwater level should be lowered to at least ( A ) below the bottom of the tube, and measures should be taken to prevent other water sources from entering the jumbo tube.   A、0.5m   B、2m   C、1.0m   D、1.5m
Reply #32018-01-14
When using manually excavated jumbo tubes, the groundwater level should be lowered to at least ( A ) below the bottom of the tube, and measures should be taken to prevent other water sources from entering the jumbo tube.   A、0.5m   B、2m   C、1.0m   D、1.5m

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.