The correct approach for testing the three main physical properties of building curtain wall projects is ( ). A. The material, structure, and installation method of the test specimen should be identical to those used in the actual project. B. In the performance testing of curtain walls, if any parameter does not meet the specified requirements, retesting is not allowed. C. In the performance testing of curtain walls, if any parameter does not meet the specified requirements, it is permissible to retest after improving the installation process and fixing any defects. D. Performance testing can be carried out after the curtain wall project is completed. E. If the performance of the curtain wall does not meet the specified requirements due to design or material issues, it is allowed to retest after making improvements. Correct answers: ACE
A. The material, structure, and installation method of the test specimen should be identical to those used in the actual project. C. In the performance testing of curtain walls, if a certain parameter does not meet the specified requirements, it is permissible to retest after improving the installation process and fixing any defects. E. If the performance of the curtain wall fails to meet the specified requirements due to design or material issues, it is allowed to conduct the testing again after making the necessary improvements
The correct methods for testing the three main physical properties of building curtain wall projects are ( ACE ). A. The material, structure, and installation method of the test specimen should be identical to those used in the actual project. B. In the performance testing of curtain walls, if any parameter does not meet the specified requirements, retesting is not allowed. C. In the performance testing of curtain walls, if any parameter does not meet the specified requirements, it is permissible to retest after improving the installation methods and fixing any defects. D. Performance testing can be carried out after the curtain wall project is completed. E. If the performance of the curtain wall does not meet the specified requirements due to design or material issues, it is allowed to retest after making improvements