The correct approach for testing the three main physical properties of building curtain wall projects is (  ).   A. The material, structure, and installation method of the test specimen should be identical to those used in the actual project. B. In the performance testing of curtain walls, if any parameter does not meet the specified requirements, retesting is not allowed. C. In the performance testing of curtain walls, if any parameter does not meet the specified requirements, it is permissible to retest after improving the installation process and fixing any defects. D. Performance testing can be carried out after the curtain wall project is completed. E. If the performance of the curtain wall does not meet the specified requirements due to design or material issues, it is allowed to retest after making improvements. Correct answers: ACE
Reply #22018-01-24
A. The material, structure, and installation method of the test specimen should be identical to those used in the actual project. C. In the performance testing of curtain walls, if a certain parameter does not meet the specified requirements, it is permissible to retest after improving the installation process and fixing any defects. E. If the performance of the curtain wall fails to meet the specified requirements due to design or material issues, it is allowed to conduct the testing again after making the necessary improvements
Reply #32018-01-24
The correct methods for testing the three main physical properties of building curtain wall projects are ( ACE ).   A. The material, structure, and installation method of the test specimen should be identical to those used in the actual project. B. In the performance testing of curtain walls, if any parameter does not meet the specified requirements, retesting is not allowed. C. In the performance testing of curtain walls, if any parameter does not meet the specified requirements, it is permissible to retest after improving the installation methods and fixing any defects. D. Performance testing can be carried out after the curtain wall project is completed. E. If the performance of the curtain wall does not meet the specified requirements due to design or material issues, it is allowed to retest after making improvements

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.