HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Should the distance between the vehicle loading station and the storage tank be determined in accordance with the spacing requirements specified for above-ground flammable liquid storage tanks in Table 4.2.12 of the fire codes?

2018-10-22View Original

Thread Content

Should the distance between the vehicle loading station and the storage tank be determined in accordance with the spacing requirements specified for above-ground flammable liquid storage tanks in Table 4.2.12 of the fire codes?
Reply #22019-04-02
The plant storage tank is part of the plant; the distance between it and the truck loading/unloading station should be determined, with the starting and ending points being the outer wall of the fire dike surrounding the plant storage tank group and the center of the crane pipe

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.