[Engineering Version] Daily Question 20180425

2018-04-25View Original

Thread Content

When excavating soil from a foundation pit (trench), which of the following statements is incorrect? A. When the soil has a high water content and is unstable, reinforcement measures should be taken. B. Generally, the principle of \"excavating in layers, providing support first before excavation\" should be followed. C. If over-excavation occurs during excavation, it should be leveled immediately. D. For soil located below the groundwater level, dewatering measures should be taken before excavation. C
Reply #22018-04-25
If over-excavation occurs during C excavation, it must be leveled immediately
Reply #32018-04-25
If over-excavation occurs during C excavation, it must be leveled immediately
Reply #42018-04-25
If over-excavation occurs during C excavation, it must be leveled immediately
Reply #52018-04-25
If over-excavation occurs during C excavation, it must be leveled immediately
Reply #62018-04-25
If over-excavation occurs during C excavation, it must be leveled immediately

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.