HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Tower insulation ring

2017-05-25View Original

Thread Content

As the title suggests, according to the dimensions shown in the diagram, is it not necessary to use insulation rings for the upper part of the tower (DN400)? Is it feasible to let the equipment flanges serve as insulation rings? Moreover, the SH_T 3098-2011 Standard for the Design of Petrochemical Towers requires that an insulation ring be installed every 3–3.5 meters.
Reply #22017-06-08
The device’s flange ring can serve as a support on its own, without the need for an additional one
Reply #32017-06-08
A thermal insulation ring can be installed around the upper part of the tower bottom near the conical seal, while it is not necessary to install one for the 400 tower section. In fact, it’s also possible to do without insulation rings; a cladding-type insulation structure can be used, though it will cost more money.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.