The first tallest tower of Zhongke Refining is hoisted in place

2019-01-22View Original

Thread Content

  On January 15, under the joint force of two crawler cranes, the "Big Mac" equipment with a length of 111 meters, a diameter of 6.92 meters, and a weight of more than 1,430 tons - the No. 2 propylene tower of the Zhongke Refining and Chemical Cracking Unit was stably installed on the tower base after more than 6 hours of continuous operation. As the tallest tower of the project, the No. 2 propylene tower is one of the core equipment of the cracking unit of the Zhongke Refining and Chemical Project. Its successful hoisting marks that the project construction has entered the fast lane of equipment installation. The picture shows the hoisting site. time: 2019/1/17 15:40:34Source: China Chemical Machinery Network

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.