Question: How to safely release the nitrogen from the equipment? Or permutation?

2023-05-12View Original

Thread Content

Help: At our construction site, we have a purification tower with a capacity of 122 m3; it is a pressure vessel that was filled with nitrogen at a pressure of 0.06 MPa upon leaving the factory. Because during the subsequent construction, it is necessary to open the manhole, allow people to enter, and install packing. How to safely release (or safely displace) the nitrogen inside? What points should be noted? What specifications or standards should be referred to?
Reply #22023-05-12
When safely releasing or replacing nitrogen, the following points should be taken into consideration: 1. Before entering the purification tower, ventilation should be carried out to remove air, and it is necessary to check for any remaining harmful gases to ensure that the air quality inside meets safety standards. 2. Before releasing nitrogen, the purification tower should first be isolated from the outside world, and all pipes and equipment connected to it must be disconnected. At the same time, the pressure inside the purification tower should be reduced below atmospheric pressure. 3. Slowly release nitrogen through the vent valves provided on the equipment inside the purification tower, to prevent excessive pressure changes that could cause damage to the equipment or injury to personnel. 4. During the release or displacement of nitrogen, it is necessary to strictly comply with relevant regulations and standards, such as the \"Regulations on Safety Inspection of Pressure Vessels\" and the \"Rules for Safety Inspection of Pressure Vessels\". 5. When carrying out operations safely, sufficient personnel and equipment should be available to ensure the safety of both people and equipment. Since there is packing installed inside the purification tower, it is recommended to perform purging before venting. For specific operating methods, refer to the relevant specifications and standards, and follow the appropriate safety procedures. .
Reply #32023-05-13
Just vent air from the top and evacuate it from the bottom for replacement. This pressure isn’t very high
Reply #42023-05-13
If this device has a valve, open it to release the pressure directly; if there is no valve, find a smaller flange opening and slowly open it to relieve pressure. When doing so, make sure the operator stays away from the exhaust outlet; After the pressure is reduced to zero, open the manhole for natural or forced ventilation; work can proceed only after the oxygen level is found to be within acceptable limits.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.