How to prevent water hammer, and backup pump setup.

2018-01-26View Original

Thread Content

Question 1: For 3 desulfurization water pumps (200 cubic meters, 35 meters, 45KW-4), if a sudden power outage occurs and backflow takes place, resulting in water hammer, how can pump damage be prevented and how should the valves be operated? Question 2: Three pumps with a capacity of 200 cubic meters each are in use simultaneously, with no downtime allowed. We want to add another backup pump for emergency use; the water flow rate must remain high, at 600 cubic meters per unit time, and the pressure requirements must also be met. How should this setup be arranged? What valves should be used, and how should it be controlled?
Reply #22018-01-26
Question 1: To prevent water hammer, a check valve should be installed at the outlet. Question two: For four pumps connected in parallel, just use the three pumps that are needed; install valves at the pump outlets so that the pumps can be isolated for maintenance
Reply #32018-01-26
Thank you for the guidance. The pipeline is made of fiberglass – can a check valve be installed on it?
Reply #42018-01-26
This depends on whether the valve is available or not
Reply #52018-01-26
The pipes are made of fiberglass, which poses some difficulties; try to find a check valve of the butterfly type with full lining that allows for gradual opening and closing~~~~ (The cylinders are made from corrosion-resistant materials) & (The fiberglass pipes need to be reinforced in certain areas, with additional support placed at the bottom)

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.