HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

【Pump Technology Edition: Daily Question】February 2, 2020 (Spring Festival bonus: 10 wealth points for those who answer correctly before the answers are revealed)

2020-02-02View Original

Thread Content

92. Rectangular splines mainly used for heavy-duty series connections with high loads. Its centering method is () centering.   A. Outer diameter B. Inner diameter C. Tooth side. The answer to question 90 from yesterday was B. 91. The grouting of the secondary grouting layer should generally be carried out within???? hours after the concealed works have been inspected and found to be satisfactory, as well as after the machine has been properly leveled and aligned; otherwise, the leveling and alignment data of the machine need to be rechecked before grouting. A、12 B、24 C、36 (Answers are released the day before they are announced; 10 wealth points for correct answers before the announcement, 5 wealth points for correct answers after the announcement, and 3 wealth points for participation.)

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.