Thread Content
On August 3, the shortlisted candidates for the 2022–2023 fixed and adjustable photovoltaic mounting system contracts of Datang Group were announced; six photovoltaic mounting system suppliers – Jiangsu Guoqiang Xingneng Energy, Jinhai Xinyuan Electric, Shaanxi Changling Electronic Technology, Tianjin Renhui New Energy, Jiangsu Huolan Electric, and Trina Solar – made it into the shortlist. It is worth noting that in the tender documents for this scaffold procurement, Datang Group released a \"List of Projects Planned to Be Launched by Datang Group in 2022,\" which includes 63 photovoltaic projects with a total installed capacity of 5.57644 million kilowatts. According to the analysis by Polaris Solar PV Network, a total of 17 provinces (municipalities, autonomous regions) are involved. Among them, Shaanxi, Hebei, and Hunan rank among the top three in terms of the planned capacity for solar photovoltaic projects, with capacities of 1.43 million kilowatts, 850,000 kilowatts, and 805,000 kilowatts respectively.
In July 2022, Datang Group issued several tender notices for the general contracting of construction work on photovoltaic projects. These projects are located in various provinces including Hebei, Guizhou, Inner Mongolia, Jiangxi, Qinghai, Zhejiang, and Xinjiang, and include various types such as agro-solar integration, fishery-solar integration, tidal flat projects, and ground-based bidding projects; the total capacity of these projects is 1.748 GW. The largest capacity is 300MW, and the smallest is 20MW. These projects mostly start in late August and are scheduled to be completed by the end of the year.