Thread Content
On December 5, Guyang County held a signing ceremony for the investment agreement regarding the project to produce 1.25 million tons per year of green electricity, green hydrogen, and green steel in an integrated manner. This signing marks a crucial step for Guyang County in promoting the green transformation and upgrading of its metallurgy industry and in implementing the \"dual carbon\" strategy, thereby helping the county to turn its abundant wind and solar resources into advantages in green industries and energy security. The total investment in this project is approximately 4.8 billion yuan, with a land area of around 1,040 mu. It mainly involves the construction of facilities for an integrated project that produces 1.25 million tons of green electricity, green hydrogen, and green steel, as well as related auxiliary facilities. The project construction period is 3 years, to be carried out in two phases. Phase 1 is scheduled to begin construction in April 2026 and go into operation in August 2027. This project will replace the traditional blast furnace carbon-reduction ironmaking method, reducing carbon emissions at the source and aligning with the trend of deep decarbonization in the steel industry. The implementation and operation of the project will bring significant economic and social benefits. Once fully built and operational, it is expected to generate an annual output value of 6.34 billion yuan, with annual tax revenues of at least 520 million yuan. It will also create employment for nearly 1,500 people, playing a significant role in expanding the regional economy, increasing fiscal revenue, and providing more job opportunities. The project will help boost Baotou’s transformation into a \"green steel city,\" and assist Inner Mongolia in turning its wind and solar resources into advantages in green industries and energy security.
【Ten Years of Rapid Development in Chemical Equipment】From 2025 to 2035, Pingmei Shenma Hydrogen Chemical Company managed to achieve the domestic production of spare parts for high-pressure coal slurry pumps used in gasification units. https://bbs.hcbbs.com/thread-5707406-1-1.html (Source: Hainan Chemical Industry Forum (HCBBS))
【Common Issues in Haichuan Pipeline Design】--Valves in confined spaces such as pits require extended operating mechanisms to reduce risks https://bbs.hcbbs.com/thread-5707433-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Equipment】From 2886 to 2025: China’s first industrial production project using its own technology for adiponitrile via the butadiene process – Tianchen Qixiang New Materials’ 200,000-ton/year adiponitrile production facility has reached full capacity. https://bbs.hcbbs.com/thread-5707419-1-1.html (Source: Haichuan Chemical Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】2888-2025: Dongfang Electric’s floating wind power hydrogen production platform receives the world’s first approval certificate https://bbs.hcbbs.com/thread-5707552-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Processing Equipment】For the first time in China, a full-scale venting test of a 10-megapascal high-pressure hydrogen pipeline was successfully carried out from 2023 to 2025. https://bbs.hcbbs.com/thread-5707979-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Equipment】From 2887 to 2025: The world’s first 50,000 tons/year facility for producing anhydrous ethanol through syngas biofermentation successfully generated high-quality anhydrous ethanol and biological proteins. https://bbs.hcbbs.com/thread-5707547-1-1.html (Source: Haichuan Chemical Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Equipment】The “second-generation high-efficiency, low-energy urea synthesis process technology” with fully independent intellectual property rights, ranging from 2890 to 2025, has reached an internationally leading level in terms of overall technical performance. https://bbs.hcbbs.com/thread-5707669-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Equipment】The “second-generation high-efficiency, low-energy urea synthesis process technology” with fully independent intellectual property rights, ranging from 2890 to 2025, has reached an internationally leading level in terms of overall technical performance. https://bbs.hcbbs.com/thread-5707669-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】2892–2025: The world’s first 630°C secondary reheating thermal power project – The bypass system for the 2×1000MW ultra-supercritical secondary reheating steam turbines at Datang Yuncheng. Link: 289 https://bbs.hcbbs.com/thread-5707850-1-1.html (Source: Haichuan Chemical Engineering Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Processing Equipment】For the first time in China, a full-scale venting test of a 10-megapascal high-pressure hydrogen pipeline was successfully carried out from 2023 to 2025. https://bbs.hcbbs.com/thread-5707979-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))