Thread Content
On June 17, the approval was granted for the project to produce 7,500 tons of propane per year. Planned start date: July 2026; planned completion date: June 2029. Location: No. 21, Longchuan Road, Erduqiao Industrial Park, Changshan County, Quzhou City, Zhejiang Province. The total investment for the project is 87.41 million yuan, of which 82.41 million yuan is allocated to fixed asset investments. The project makes use of a warehouse of Class C with an area of 2,389.61 square meters, while electricity and fire protection facilities are provided by the first phase of the facility. An additional 25 mu of land will be used to build Warehouse Type A-2, Warehouse Type A-3, a warehouse for bottles of Type A, a filling area for bottles of Type A, a compressor room, a spare parts warehouse, a tank burial area for Type A filling workshops, and Warehouse Type B, among other facilities. By utilizing the existing factory site of the company, a Class B filling workshop, a Class C warehouse area, and a Class D workshop are planned and arranged, ultimately achieving an annual production capacity of 7,500 tons of propane.
【Haichuan Safety Discussion】Hidden Dangers Around Us – Is it an overzealous requirement to install combustible gas detectors outdoors without a rain cover? ? https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5724304 (Source: Haichuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
【HaiChuan Safety Discussion】Hidden Dangers Around Us – Forklifts Without License Plates; It does not comply with the provisions of Article 4.12.2 of the \"Rules for the Use and Management of Special Equipment\" TSG 08—2026: https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5724341 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
[Haichuan’s Guide to Chemical Equipment] Series Summary Post – Getting to Know Equipment, Understanding Equipment, and Making Good Use of It https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5719196 (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
【In-depth Discussion on Modular Installation by HaiChuan】Modular construction of the steel structure for Gallery 3 in Nantong Blue Sea New Materials’ FDPE plant – achieving one-time transportation, one-time installation, and successful completion in just one attempt. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5723569 (Source: HaiChuan Chemicals Forum (Hua Hai Chuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Equipment】The 400,000 tons per year acrylonitrile plant at Zhenhai Refining & Chemical has been operating stably for one year, from 2017 to 2026. The independently developed S-ANT acrylonitrile technology package has been successfully industrialized. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5724666 (Source: HaiChuan Chemical Industry Forum (HuaHaiChuanLiu hcbbs))
【Ten Years of Great Development in Chemical Equipment】3164-2026: China National Petroleum Corporation’s first project – The 50,000-ton/year co-production project for 1-hexene and 1-octene at Daqing Petrochemical was successfully handed over. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5723648 (Source: Haichuan Chemical Forum (HCBBS))
[Common Issues in Haichuan Pipeline Design] – A compilation post; images and text are being updated. Feel free to join the discussion: https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5705828 (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
[HaiChuan Safety Forum] Hidden hazards around us – Explosion-proof distribution boxes lack “Do not open after power is cut off” warning signs. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5724919 (Source: HaiChuan Chemical Forum (Huahai Chuanliu hcbbs))
【HaiChuan Safety Discussion】Hidden Dangers Around Us – Unsealed or Plastically Sealed Extra Power Inlets in Explosion-Proof Electrical Equipment https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5722158 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
【Ten Years of Rapid Development in Chemical Equipment】The 300,000-ton synthetic ammonia plant built by Qinghai Salt Lake Yuanpin from 2015 to 2026 utilized internal components of the synthetic tower manufactured by Nanjing Jutuo; these components passed the performance assessment successfully. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5723201 (Source: Haichuan Chemical Industry Forum (Hcbbs))