Installation work on large-scale equipment has commenced for the methanol distillation unit of the Phase II project of Shaanxi Coal Yulin Chemical

2026-01-26View Original

Thread Content

At 9:17 a.m. on January 26, the low-pressure tower for the methanol distillation unit of Phase 1 of the second phase of the Shaanxi Coal Yulin Chemical project – a structure 64.9 meters tall, with a diameter of 5 meters and a lifting weight of 285.14 tons – was lifted into place by Shaanxi Huajian Lifting Company. This tower is the first large-scale equipment in the methanol distillation plant, marking the beginning of the installation of subsequent large-scale components. For this lifting operation, an 800-ton crawler crane was used as the main crane, while a 260-ton crawler crane was responsible for assisting with the movement of the load. The space at the methanol distillation plant is limited, so precise control is required for all lifting, moving, and positioning tasks – no mistakes are allowed. To overcome these challenges, the lifting team adhered to the principle of \"planning early, preparing early, and acting early,\" carefully planning and meticulously implementing every detail of the construction process. By making thorough preparations to address various risks, they ensured that the lifting tasks were carried out safely and in an orderly manner. Meanwhile, the other 4 columns to be installed in the methanol distillation unit before the Spring Festival are also in full swing with on-site \"floor welding and outfitting\" work. The critical phase coincided with the arrival of a cold wave, and the low temperatures posed significant challenges to the welding quality of the equipment, the toughness of the steel, and the construction efficiency. To address this issue, before welding, it is necessary to first check whether the gas cylinder nozzle is blocked or frozen, to ensure smooth and stable use of the shielding gas ; Secondly, preheating is carried out on the weld area ; Before use, the flux is baked as specified to ensure its moisture content remains below 0.1%, thereby creating favorable conditions for subsequent lifting. It is reported that the lifting company is responsible for lifting 147 large-scale pieces of equipment in Section 2 of this project, with a total lifting weight of approximately 31,341.4 tons; the total weight of the equipment that exceeds size limits is 9,898.62 tons. The completion of this first lifting task not only marks the beginning of the lifting operations for the remaining large-scale equipment in the methanol plant, but also signifies that the construction phase has shifted from civil engineering work to installation work. The lifting company will continue to focus on the field of lifting operations, and by leveraging its superior professional skills and robust lifting capabilities, it will contribute to the construction of the Shaanxi Coal Yulin Chemical 15 million tons per year coal conversion project aimed at achieving clean and efficient processing of coal.
Reply #22026-01-26
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – with pictures and text; everyone is welcome to participate in the discussion: https://bbs.hcbbs.com/thread-5705518-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #32026-01-26
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – with pictures and text; everyone is welcome to participate in the discussion: https://bbs.hcbbs.com/thread-5705518-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #42026-01-27
【Ten Years of Rapid Development in Chemical Equipment】2988-2026: “Robots + AI”! Hangyang Group’s \"Intelligent On-site Inspection Management System for Air Separation Units\" has been put into full use: https://bbs.hcbbs.com/thread-5712099-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #52026-01-27
【Ten Years of Rapid Development in Chemical Equipment】2988-2026: “Robots + AI”! Hangyang Group’s \"Intelligent On-site Inspection Management System for Air Separation Units\" has been put into full use: https://bbs.hcbbs.com/thread-5712099-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #62026-01-27
【Ten Years of Rapid Development in Chemical Equipment】Key technologies for the efficient co-production of synthetic ammonia and LNG from smokeless pulverized coal, 2989–2026, have been approved for use. https://bbs.hcbbs.com/thread-5712191-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
Reply #72026-01-27
【Ten Years of Rapid Development in Chemical Engineering Equipment】China’s first heat network return water recycling-based heat pump combined heating project was put into operation in Beijing from 2990 to 2026. https://bbs.hcbbs.com/thread-5712221-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #82026-01-28
【Ten Years of Rapid Development in Chemical Engineering Equipment】2991–2026: SHENGU’s world’s first large-flow centrifugal steam compressor was successfully tested https://bbs.hcbbs.com/thread-5712284-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #92026-01-28
【Ten Years of Rapid Development in Chemical Equipment】The first domestic Type IV hydrogen gas tube bundle container was successfully produced between 2029 and 2026. https://bbs.hcbbs.com/thread-5712323-1-1.html (Source: Haichuan Chemical Forum (Hua Hai Chuan Liu hcbbs))
Reply #102026-01-29
【Ten Years of Rapid Development in Chemical Equipment】The world’s largest VOCs treatment facility for coal chemical industries was put into operation at Zhongyuan Dahua from 2994 to 2026. https://bbs.hcbbs.com/thread-5712394-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #112026-01-29
【Ten Years of Rapid Development in Chemical Equipment】The world’s largest VOCs treatment facility for coal chemical industries was put into operation at Zhongyuan Dahua from 2994 to 2026. https://bbs.hcbbs.com/thread-5712394-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.