Thread Content
Recently, the intermittent heating furnace (F-204), a key equipment in the ethanol production unit of Shaanxi Yanchang Petroleum Yulin Kaiyue Coal Chemical Co., Ltd.’s 500,000 tons per year methanol-to-ethanol project, was successfully ignited for the first time, marking the official transition of this ethanol production unit from the construction phase to the pre-production phase. The intermittent heating furnace (F-204) of the ethanol production unit in Shaanxi Yanchang Petroleum Yulin Kaiyue Coal Chemical’s 500,000 tons per year methanol-to-ethanol project achieved successful first ignition. This heating furnace is responsible for drying and activating the catalyst, and the quality of its operation is crucial for ensuring the long-term safe operation of the facility. To date, the furnace heating process is progressing steadily in accordance with the established temperature rise curve, laying a solid foundation for subsequent trial operations and commissioning. The site for Shaanxi Yanchang Petroleum Yulin Kaiyue Coal Chemical Co., Ltd.’s 500,000 tons per year methanol-to-ethanol production project is located on the industrial land reserved within Kaiyue Coal Chemical’s existing plant. The project utilizes the DMTE methanol-to-ethanol process technology developed by the Dalian Institute of Chemical Physics, Chinese Academy of Sciences; it involves upgrading the existing shift and purification units, and making use of the excess syngas and methanol available in those units for expansion and renovation. The project consists of four sections: a new factory complex, a vinyl acetate plant area, a circulating water tank area, and a reserved area. The total land area of the project is 53.9626 hectares, all of which are permanent land uses. The total investment amounts to 6.868 billion yuan, of which the estimated cost for soil and water conservation measures is around 107 million yuan. Construction contents: include a 200,000-ton/year ethyl acetate plant, a 250,000-ton/year ethanol-to-ethylene plant, a 250,000-ton/year vinyl acetate plant, and a 200,000-ton/year EVA plant, among others. The 250,000 tons/year vinyl acetate plant and associated auxiliary facilities were constructed in advance and put into operation. It will be constructed simultaneously with the Kaiyue Coal Chemical 500,000 tons/year methanol-to-ethanol project.
【Haichuan Equipment Guessing Game】What device is this that looks like a Katyusha? https://bbs.hcbbs.com/thread-5708487-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – with pictures and text; everyone is welcome to join the discussion: https://bbs.hcbbs.com/thread-5705518-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
【Ten Years of Rapid Development in Chemical Engineering Equipment】2897-2025: CNOOC’s equipment development efforts have led to the successful use of multi-functional robots for coating treatment of crude oil storage tanks. https://bbs.hcbbs.com/thread-5708161-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
[Common Issues in Haichuan Pipeline Design] – A compilation post; images and text are being updated. Feel free to join the discussion: https://bbs.hcbbs.com/thread-5705828-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2029 to 2025, Beijing Haideliz developed and delivered a 30-kilowatt methanol-hydrogen combined heat and power system on its own https://bbs.hcbbs.com/thread-5708466-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Equipment】Breakthroughs from 2905 to 2025! SHanghai Electric’s 300MW-class large-scale air turbines ensure the operation of China’s salt-cave compressed air energy storage demonstration project https://bbs.hcbbs.com/thread-5708518-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Equipment】Breakthroughs from 2905 to 2025! SHanghai Electric’s 300MW-class large-scale air turbines ensure the operation of China’s salt-cave compressed air energy storage demonstration project https://bbs.hcbbs.com/thread-5708518-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Equipment】2907-2025: China’s First Civilian Liquid Hydrogen Plant Obtains Safety Production License https://bbs.hcbbs.com/thread-5708618-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Engineering Equipment】The world’s largest 9600 Nm³/h multi-functional hydrogen production BOP system was successfully delivered https://bbs.hcbbs.com/thread-5708761-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))