HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Regarding the issue of equipment pressure testing, it’s the first time I’ve seen this in all these years

2015-06-04View Original

Thread Content

After passing the pressure test, the equipment is dried, and the dew point after drying reaches -5°C. I’m asking all the experts here to help explain it!
Reply #22015-06-04
It’s a matter of the water vapor content in the gas; the dew point requirement for instrument air is several dozen degrees below zero.
Reply #32015-06-04
It means that after drying, it must be sealed before being shipped. Just as it is required to transport under inert gas protection.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.