HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Daily Question June 16, 2015 (EIA Discussion): 3 wealth points for replies, plus 5 wealth points for correct answers

2015-06-16View Original

Thread Content

This post was last edited by Zhang Xiaopeng on 2015-6-24 at 12:51. 24. A leakage occurred in a sewage tank; there is a well tapping into an artesian aquifer 480 meters downstream of that site. The aquifer of this water well has a permeability coefficient of 120 m/d, an effective porosity of 40%, and a hydraulic gradient of 0.5%. The predicted time for sewage leakage to move horizontally to the water intake well after entering the aquifer is ( ). A. 4 days B. 192 days C. 320 days D. 600 days Explanation: Flow rate = (permeability coefficient/effective porosity) * hydraulic gradient. Time = 480 m/flow rate. Flow rate = (120/0.4) * 0.5% = 1.5 m/day. Time = 480/1.5 = 320 days. The correct answer is C
Reply #22015-06-16
A leakage occurred in a wastewater tank, and there is a well in an artesian aquifer 480 meters downstream of that wastewater source. The aquifer of this water well has a permeability coefficient of 120 m/d, an effective porosity of 40%, and a hydraulic gradient of 0.5%. The time it takes for wastewater to migrate horizontally to the water extraction wells after seeping into the aquifer is (B). A. 4 days B. 192 days C. 320 days D. 600 days. Please don’t be offended if this is just a guess; P
Reply #32015-06-16
I can’t do it either; I’ll guess. Choose C
Reply #42015-06-16
B. . . . . B. . . . . B. . . . . B. . . . . B. . . . . B. . . . . B. . . . . B. . . . .
Reply #52015-06-16
24. A sewage tank leaked, and there is a groundwater well in an artesian aquifer 480 meters downstream. The aquifer of this water well has a permeability coefficient of 120 m/d, an effective porosity of 40%, and a hydraulic gradient of 0.5%. The predicted time for the sewage leakage to move horizontally to the water extraction well after entering the aquifer is (C). A. 4 days B. 192 days C. 320 days D. 600 days
Reply #62015-06-16
A leakage occurred in a wastewater tank, and there is a well in an artesian aquifer 480 meters downstream of that wastewater source. The aquifer of this water well has a permeability coefficient of 120 m/d, an effective porosity of 40%, and a hydraulic gradient of 0.5%. The predicted time for the sewage leakage to move horizontally to the water intake well after entering the aquifer is (C. 320 days).
Reply #72015-06-16
A leakage occurred in a wastewater tank, and there is a well in an artesian aquifer 480 meters downstream of that wastewater source. The aquifer of this water well has a permeability coefficient of 120 m/d, an effective porosity of 40%, and a hydraulic gradient of 0.5%. The time it takes for the polluted water to migrate horizontally to the water extraction wells after seeping into the aquifer is (C). A. 4 days B. 192 days C. 320 days D. 600 days

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.