HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Location selection for elbows in trench excavation in mountainous areas

2015-06-29View Original

Thread Content

I’ve encountered small-scale projects where the designs provided were completely unusable; I had to determine the routes on my own. Now the pipes run along a structure that resembles 3 steps. When digging the trenches, I had to decide on the locations for the slope changes by myself. Have any seniors encountered this before? How do you decide on the locations for the bends?
Reply #22015-06-30
The location of the elbow should be determined by the depth of the land being sold.
Reply #32015-06-30
As for the horizontal position, it relies entirely on experience – there are no drawings
Reply #42015-06-30
Minimize the number of elbows; if necessary, it is best to use 135-degree elbows to reduce hydraulic resistance.
Reply #52015-06-30
I’m also looking at it; I’m also concerned about this issue
Reply #62015-06-30
Some designs get stuck on a minor issue: due to insufficient research by the designers, it is only during construction that the difficulties are realized. Based on the on-site conditions and with flexible adjustments to the design as a reference, it is not necessary to insist on strict adherence to the original design; attempting to do so often results in wasted effort and resources, along with future problems.
Reply #72015-06-30
That makes sense. Talk about the terraced areas and the digging of drainage ditches. Please address the issues I mentioned
Reply #82015-07-01
If the designed diagram isn’t usable, go and observe the site in person; once you’re familiar with it, a more reasonable solution will always emerge. I think we should first consider the layout of the pipeline positions, ensuring they comply with the regulations, and only then focus on ease of construction; the elbows don’t necessarily have to be 135 degrees or 90 degrees
Reply #92015-07-28
The long-distance pipelines we construct don’t have sharp bends; the maximum angle is around 30 degrees

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.