51. Three months after the trial production of a petrochemical project, it entrusts a qualified entity to carry out the environmental protection completion inspection, which requires on-site inspections (). A. Feasibility study report B. Environmental monitoring instruments and equipment C. Online monitoring equipment for main drainage outlets D. Enterprise environmental management system Correct answer: BCD Explanation: See the Technical Specifications for Environmental Protection Acceptance of Construction Projects
B. Environmental monitoring instruments and equipment C. Online monitoring equipment for main drainage outlets D. Enterprise environmental management systems
I think the answer should be that all three, bcd, are needed
Three months after the trial production of a petrochemical project, it commissioned a qualified entity to carry out the environmental protection completion inspection, which requires on-site inspections (B, C, D). Answer: B. Environmental monitoring instruments and equipment C. Online monitoring equipment for main drainage outlets D. Enterprise environmental management systems
B. Environmental monitoring instruments and equipment: D:D
51. Three months after the trial production of a petrochemical project, it commissioned a qualified entity to carry out the environmental protection completion inspection, which requires on-site inspections (bcd). A. Feasibility study report B. Environmental monitoring instruments and equipment C. Online monitoring equipment for main drainage outlets D. Enterprise environmental management system
Three months after the trial production of a petrochemical project, it commissioned a qualified entity to carry out the environmental protection acceptance inspection upon completion, which requires on-site inspections (). B. Environmental monitoring instruments and equipment C. Online monitoring equipment for main drainage outlets D. Enterprise environmental management systems
B. Environmental monitoring instruments and equipment C. Online monitoring equipment for main drainage outlets D. Enterprise environmental management systems