Technical discussion: Issues with concrete pipe racks

2015-07-29View Original

Thread Content

This post was last edited by hesonchang214 on 2015-9-28 08:18. Is it necessary to embed angle steel running the full length at the top of the beams in reinforced concrete pipe racks?
Reply #22015-07-29
Generally, steel plates with welded rebar are more common
Reply #32015-07-29
There is no such concept; below are photos of a newly built pipeline corridor from 2009:
Reply #42015-09-24
There is no such requirement; generally, they are buried as needed. The practice of burying them all is usually adopted only when the design timeline is quite tight.
Reply #52015-10-12
That’s right; the design timeline is tight. Continuous embedments are placed in the beams to facilitate the installation of pipe supports in the future.
Reply #62015-10-14
Check the design specifications for pipe racks and pipe supports, 20120426

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.