HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

The debate over collapse

2015-08-03View Original

Thread Content

Debris collapse debate: around the valve chamber. Around the buried pipes, compaction is carried out as specified in the drawings during backfilling; this has been verified. It rained heavily for several days, leading to further collapses, and the construction company refused to make repairs. What should I do?
Reply #22015-08-03
It has been checked. It was caused by inadequate supervision.
Reply #32015-08-03
If it was done according to the drawings and passed inspection, then of course it was rejected. To make corrections, further negotiations are needed, along with additional work volume.
Reply #42015-08-03
It can only be attributed to geological reasons or natural factors; to carry out corrections, permits are required, as construction must be done in accordance with the plans

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.