HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Which quota should be used for the application of elastic putty with mineral oil at room temperature at the bottom of tanks?

2015-08-07View Original

Thread Content

I haven’t tried applying a fixed quota to this item; how should I do it?
Reply #22015-08-08
There should be quotas for construction equipment and personnel; generally, the quotas of the respective province are used.
Reply #32015-08-09
There is a specific calculation method for this; you should look up the construction cost standards

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.