【Daily Question】Question for Issue 20150828

2015-08-28View Original

Thread Content

Participation reward: 2 Wealth. Reward for correct answer: 9 wealth. According to the regulations, the exterior walls, floors, or roofs of the boiler room must have sufficient pressure relief area. Which of the following statements regarding the pressure relief area is incorrect? ( ) (A) There should be a pressure relief area equivalent to 10% of the floor area of the boiler room. (B) There should be a pressure relief area equal to 10% of the floor area of the boiler house. (C) The net cross-sectional area of the pressure relief shafts in underground boiler rooms must meet the requirements regarding the pressure relief area. (D) If the pressure relief area does not meet the requirements, metal explosion-proof plates can be installed on the inner walls and ceiling of the boiler room as a supplementary measure. Answer: B. A new activity has started in the production area; there are attractive prizes available, so hurry up and participate: 【Production in Summer】 – The production area is now in “intensive training during the hot summer days” mode
Reply #22015-08-28
According to the regulations, the exterior walls, floors, or roofs of the boiler room must have sufficient pressure relief area. Which of the following statements regarding the pressure relief area is incorrect? (B) (A) There should be a pressure relief area equal to 10% of the floor area of the boiler room. (B) There should be a pressure relief area equal to 10% of the floor area of the boiler house. (C) The net cross-sectional area of the pressure relief shafts in underground boiler rooms must meet the requirements regarding the pressure relief area. (D) When the pressure relief area does not meet these requirements, metal explosion-proof plates can be installed on the inner walls and ceiling of the boiler room as a supplementary measure
Reply #32015-08-28
(A) There should be a pressure relief area equivalent to 10% of the boiler room’s floor area
Reply #42015-08-28
According to the regulations, the exterior walls, floors, or roofs of the boiler room must have sufficient pressure relief area. Which of the following statements regarding the pressure relief area is incorrect? (B)
Reply #52015-08-28
According to the regulations, the exterior walls, floors, or roofs of the boiler room must have sufficient pressure relief area. Which of the following statements regarding the pressure relief area is incorrect? (A) is incorrect.
Reply #62015-08-28
B should be 10% of the boiler room floor area.
Reply #72015-08-28
(B) There should be a pressure relief area equivalent to 10% of the boiler room’s floor area
Reply #82015-08-28
According to the regulations, the exterior walls, floors, or roofs of the boiler room must have sufficient pressure relief area. Which of the following statements regarding the pressure relief area is incorrect? (B) (A) There should be a pressure relief area equal to 10% of the floor area of the boiler room. (B) There should be a pressure relief area equal to 10% of the floor area of the boiler house. (C) The net cross-sectional area of the pressure relief shafts in underground boiler rooms must meet the requirements regarding the pressure relief area. (D) When the pressure relief area does not meet these requirements, metal explosion-proof plates can be installed on the inner walls and ceiling of the boiler room as a supplementary measure
Reply #92015-08-28
(A) There should be a pressure relief area equivalent to 10% of the boiler room’s floor area

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.