Thread Content
Bridge cranes are very commonly used engineering machinery in the construction industry, with a wide range of applications. However, various faults are inevitable during the operation of the entire machine. For example, the common failures we see. What should we do in such situations? Next, the editor from China Lifting Network will explain it to you If a bridge crane fails, certain emergency measures must be taken promptly to analyze the safety incidents that have occurred. A common practice is to move the bridge crane multiple times to check whether the lifted object has dropped. Even after locking the control handle, the bridge crane remains malfunctioning; the main reasons for this condition are as follows. I. The faults are likely to occur primarily within the main carriage moving mechanism and the auxiliary carriage moving mechanism. At this point, it is necessary to immediately stop the power supply to the crane. II. Another possibility is an accident inside the elevator. Remember not to cut off the power supply in order to ensure the safety of the driver, and work closely with personnel on the ground to enable the hook to land safely. III. If inspections reveal that no malfunction exists, then it indicates an electrical fault inside the bridge crane, as well as a false appearance of a malfunction. At this point, all electrical power needs to be cut off.
I learned it! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !