HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Incident Handling 41: How should tube failures in the reheater of a circulating fluidized bed boiler be handled?

2015-09-10View Original

Thread Content

How should tube failures in the reheater of a circulating fluidized bed boiler be handled?
Reply #22015-09-10
The reheater is usually a suspended screen inside the furnace; in the event of a tube rupture, the furnace must be stopped immediately. At the same time, water must be added to the drum to prevent dry burning. The feed should be stopped and air blown in to cool down the furnace. After 48 hours of shutdown, slag removal, and ventilation, it is possible to enter the furnace again to analyze the problem, determine a solution, replace the damaged section of the tube, and repair the refractory material. Drive
Reply #32015-09-11
Once a tube in the reheater bursts, the plant should be stopped immediately to identify the cause and carry out repairs or replacements

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.