The new atmospheric and vacuum distillation unit that the company has installed is about to begin operation, and I feel that there are still some aspects that aren’t fully prepared. I hope that all the experts from Haichuan can provide their valuable suggestions; thank you very much! !
1. The three inspections and four determinations prior to starting work must be carried out carefully, and the corrective actions must be completed and verified! 2. A thorough safety risk assessment must be conducted prior to commencement of work, and the PSSR form must be completed and signed off ; 3. Tools and materials required for starting work must be in place ; 4. All accident response plans for starting up operations must be prepared ; Training Studies* ; 5. Provide instructions on the startup procedure and ensure strict adherence to the operating procedures ; All these have been carried out carefully, so the project will definitely succeed smoothly!
The PSSR form seems to be very important, so let’s check it item by item
I feel that, in general, there are no major issues with driving successfully; what’s important is that the first three months after starting to drive are when problems are most likely to occur. Factors such as relaxation on the part of the driver, unfamiliarity with new equipment, and inadequate preparation for emergency situations can all lead to problems after beginning to drive.
The startup checklist outlines each item for thorough verification; nothing is left unaddressed if it’s unclear. The more thoroughly everything is prepared, the smoother the startup process will be
The small unit can be started in any way, but starting it at a capacity of 5 million tons per year requires following specific steps; a failed start-up will lead to reduced efficiency