HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

What inspections and test operations should be carried out on a crane before it leaves the factory?

2015-10-10View Original

Thread Content

All mechanisms of the crane must undergo no-load testing and inspection of its various components before leaving the factory. The main inspection requirements for cranes in factories are as follows: 1. Check whether the materials used in manufacturing the crane, as well as the cast parts, meet the standards. 2. Check whether the protective measures for electrical equipment and instruments meet the requirements. 3. Check whether the dimensional tolerances of the metal structure and the quality of the welding meet the standard requirements. 4. Check the reliability of the electrical control system and wiring system. 5. Check whether the operation of each mechanism and its installation position are accurate. 6. Check whether the paint quality of the crane meets the requirements. 7. Check whether the quality of all components of the mechanism meets the standard requirements. The prefabricated crane comes with a qualified manual; after leaving the factory, it is installed and tested for operation with no load by the user themselves. For new products, installation and testing are generally carried out by the manufacturer. However, if the factory conditions do not permit it, the manufacturer’s technical staff can perform the installation and testing at the user’s construction site.
Reply #22015-10-10
I learned it! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.