HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Seeking help regarding an old issue with the five-valve assembly

2015-11-02View Original

Thread Content

Here, we use a five-valve assembly plus a condenser and transmitter to measure steam flow; the boiler has to be shut down in winter. 1. Does the condenser need to have water drained (with temperatures as low as minus 40 degrees)? 2. Is the shutdown of the five-valve assembly done before or after the boiler is shut down? 3. How do I drain water? 4. How should the five-valve assembly be operated when starting the boiler?
Reply #22015-11-03
It cannot be fully illuminated, which can lead to inaccurate measurements

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.