Design issues of blowdown valves

2015-11-04View Original

Thread Content

1. Is the correct translation a pressure relief valve? 2. What are the differences from ordinary pneumatic on-off valves in terms of type, valve material, air circuit design, etc.? 3. What are the requirements for solenoid valves? SIL? 4. Are there any requirements regarding travel time? Source: “Emergency shutdown and blowdown valves shall be anti-static ON-OFF ball valve type. Full Bore or Reduced Bore ball valves may be used as governed by the piping specification. Emergency shutdown valves on pipelines shall be full bore ball valves to allow for pigging operations. Emergency shutdown valve and blowdown valve size shall be the same as line size. Emergency shutdown valves and blowdown valves shall not be used for regulating purposes.””
Reply #22015-11-05
1. Is the correct translation a pressure relief valve? 2. What are the differences from ordinary pneumatic on-off valves in terms of type, valve material, air circuit design, etc.? 3. What are the requirements for solenoid valves? SIL? 4. Are there any requirements regarding travel time? 1. It usually refers to a discharge valve for liquids, used to remove material from a container/reactor. For example, discharging the hydrocarbon materials at the bottom of the tower under fire conditions. 2. No. But note that in the case of fire scenarios, engineering regulations may require fire protection measures such as wearing fire-resistant coats to prevent external fires. Large foreign companies (BP, BASF, SHELL) have such requirements. The gas circuit may also require “online testing,” such as testing it once a year to check whether it functions properly. 3. It is basically a SIL circuit, including solenoid valves. 4. Since it involves cutting first and then performing a BLOWDOWN, the action time is short, so speed is required. Instead, a flow-limiting orifice plate is installed downstream of the valve to prevent too rapid discharge from causing excessive vaporization of hydrocarbons inside the equipment and resulting in overpressure; this is done to address concerns regarding the large discharge capacity of the safety valve. @jiaguoyun

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.