Participation reward: 2 Wealth. Reward for correct answer: 9 wealth. (Multiple-choice question) Question: In quality improvement, when the measures taken do not yield the expected results, the following ( ) situations should be considered. A. Is it implemented as planned? B. Is the distinction between phenomena and root causes made? C. Is it carried out using the 5W1H method? D. Are there issues with the planning? The correct answers to this question are A and D.
Reply #22015-11-17
In quality improvement, when countermeasures taken do not yield the expected results, the following (A.D) situations should be considered. A. Is it implemented as planned? B. Is the distinction between phenomena and root causes made? C. Is it carried out using the 5W1H method? D. Are there issues with the planning?
Reply #32015-11-17
A, D. -------------------------------------------------
Reply #42015-11-17
A. Is it being implemented as planned? D. Are there issues with the plan?
Reply #52015-11-17
In quality improvement, when countermeasures taken do not yield the expected results, the following (A D) situations should be considered.
Reply #62015-11-17
A D !!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!
Reply #72015-11-17
B. Distinguish between the elimination of phenomena and causes
Reply #82015-11-17
In quality improvement, when countermeasures taken do not yield the expected results, the following (A D) situations should be considered. A. Is it implemented as planned? B. Is the distinction between phenomena and root cause elimination made? C. Is it carried out using the 5W1H method? D. Are there issues with the planning?
Reply #92015-11-17
Title: In quality improvement, when countermeasures taken do not yield the expected results, the following (A D) situations should be considered. A. Is it implemented as planned? B. Is the distinction between phenomena and root causes made? C. Is it carried out using the 5W1H method? D. Are there issues with the planning?
Reply #102015-11-17
I think it’s B; I really don’t know how to do this, I’m going by my own understanding
Reply #112015-11-17
In quality improvement, when countermeasures taken do not yield the expected results, the following (A D) situations should be considered. A. Is it implemented as planned? B. Is the distinction between phenomena and root causes made? C. Is it carried out using the 5W1H method? D. Are there issues with the planning?

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.