Positioning of piping equipment

2015-12-29View Original

Thread Content

For equipment positioning on process piping, is it the positioning based on the equipment itself?
Reply #22015-12-29
Generally, precise equipment positioning is used when specialized equipment is installed, and piping work is carried out based on this~
Reply #32015-12-29
Isn’t the equipment location determined by the general layout team?
Reply #42015-12-29
What is the general layout engineering field? Who decides on the device model?
Reply #52015-12-29
The device model is determined by the device specialists. The general layout discipline is responsible for planning the overall arrangement; oh, is this on land? Then there is no need to consider the position of the center of gravity.
Reply #62015-12-30
The workflow is as follows: 1. The process engineering team provides a schematic diagram of the equipment and sends the equipment data sheet to the equipment and piping engineering teams; 2. The equipment specialty is responsible for the design of the equipment itself, while the piping specialty provides the equipment specialty with information regarding the location of pipe connections and the height of the equipment pedestals. It also supplies the civil engineering specialty with the elevation values for the equipment foundations. Additionally, the piping specialty prepares the plan layout of the equipment, that is, the exact positioning of the equipment within the installation. The selection of forming equipment or standard equipment is generally based on data parameters or models provided by the process engineering team, such as for standard heat exchangers. Non-standard equipment requires analysis on a case-by-case basis.
Reply #72015-12-30
It seems I understand a bit now – in the work process of petrochemical design, how is the height of the equipment skirt proposed by the piping team determined? ? ?
Reply #82015-12-30
It’s difficult to give a general answer to this; generally, it is considered in relation to the pump’s NPSHr. Another factor is the elevation of the lowest platform, which must be at least 2200 mm above the ground level, in addition to other requirements as well. This has a lot to do with habit or experience.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.