Work during the trial operation phase

2016-02-29View Original

Thread Content

May I ask, after the production facility is built, how should the commissioning phase be carried out, and what specific tasks should the Mobile Equipment Department undertake? We have a set of equipment that has been installed, but we are not sure whether pressure testing was carried out, whether there were tests to verify the operation of each unit individually, or whether purging was done. After it was installed, it has just been left there; it’s been about one and a half years now. We plan to start trial operations in mid-August this year. What specific tasks do we need to carry out now, and what should the equipment department do? (Because the deputy general manager in charge has no knowledge of this industry, and our equipment department currently also has no director, we all don’t know how to carry out our work; we’re all very confused.)
Reply #22016-02-29
Check whether there are records of pressure testing, trial operation of mechanical equipment, instrument calibration, and interlock testing; if no records exist, promptly organize the necessary work to be carried out.
Reply #32016-02-29
Wow, don’t you guys know if your equipment has been pressure-tested?
Reply #42016-02-29
After such a long period of time: it is recommended to redo all the work – conduct pressure testing and purging of the pipelines, carry out individual unit tests, and measure the performance of each device; (Including equipment alignment ; Is the wiring direction of the motor correct? ; Is the wiring loose? ; Whether the equipment generates heat when operating alone); water operation (mainly to test program interlocks, the DCS program, and whether the alarm settings are appropriate) ;

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.