HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

【Chemical Processing】Seeking the operating procedures for purging and flushing the reactor before replacing the catalyst in MTBE production

2016-03-01View Original

Thread Content

This post was last edited by Xiao Gong 1985 on 2016-3-4 08:32. I’m looking for the operating procedures for purging and replacing the container equipment before replacing the catalyst in MTBE systems; in other words, I want to know what tasks need to be carried out during such purging and replacement processes. . . . . . . Thank you. It would be great to have some operating procedures as a reward_7ree
Reply #22016-03-01
Why not @me? Actually, we don’t have it either! However, you can refer to the articles I shared before on replacing the catalyst without stopping the vehicle! If not, I made one up myself.
Reply #32016-05-03
I’ve found the detailed information for you. https://yunpan.cn/cPEFf5HcLvx9c Access password

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.