HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

One question per day; those who answer correctly receive 6 wealth points, while participants receive 2 wealth points; Question 491

2016-04-14View Original

Thread Content

Fill-in-the-blank: Before disassembling the feed monomer pump (centrifugal type) in the polymerization workshop, the workshop should first implement safety measures for the centrifugal pump such as power shutdown, gas displacement, ( ), ( ) etc. Only after completing the relevant ( ) form can the maintenance personnel proceed with the work. Answer: Close the inlet and outlet valves, install blind flanges, prepare a work order
Reply #22016-04-14
Oil and liquid discharge work order
Reply #32016-04-14
Close inlet and outlet valves, install blind flanges, prepare work order
Reply #42016-04-14
(Blind flange installation), (analysis), etc.; complete the (hot work) permit process first
Reply #52016-04-14
Close inlet and outlet valves, install blind flanges, work order

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.