HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

After the gasification furnace is built, how to enter it for inspection?

2016-06-02View Original

Thread Content

After the gasification furnace is built, what are some good methods for entering it to conduct inspections?
Reply #22016-06-02
Check the brick joints during furnace construction, and check them again at the end. The most important thing is the inspection after baking the furnace. Fill the entire framework!
Reply #32016-06-03
After the furnace is dried, it cools down naturally; once the conditions for entry are met, a full-scale scaffolding structure is set up, and checks are carried out to ensure that there are no cracks in the brick joints or any other issues

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.