HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Issues related to the renovation of delayed coking units

2016-10-29View Original

Thread Content

Experts, we would like to upgrade the pressure resistance of the coking tower to 1 MPa. Is this possible?
Reply #22016-10-29
It depends on what the design pressure of your original coking tower was; generally speaking, it’s difficult to achieve that.
Reply #32016-10-29
The usual design pressure is around 3 kilograms; it’s a bit difficult to change it to 10 kilograms
Reply #42016-11-01
10 kilograms of pressure? This results in a much lower yield, while the yield of coke increases. The oil yield is low.
Reply #52016-11-02
Only by changing the tower – is it to produce needle coke?
Reply #62016-11-02
Such a possibility should not exist.
Reply #72016-11-03
Yes, to produce needle coke, it should be possible to redesign the coke tower, right?
Reply #82016-11-06
Such a possibility should not exist.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.