HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Guru, please help!

2016-11-14View Original

Thread Content

During the operation of the reduction furnace for over 20 hours, the rods are replaced; there is enough silicon core left after disassembling the furnace. Upon inspection, it was found that this electrode cooling water pipe was adjacent to the feed pipeline. What consequences can high temperature in this cooling water pipe cause?
Reply #22016-11-14
The melting of silicon cores should have little to do with cooling water; the main considerations are loading into the furnace and control
Reply #32016-11-16
It’s mainly due to an inappropriate match between temperature and material quantity
Reply #42016-11-19
There is an issue with the feed rate matching; make adjustments promptly when issues are detected, and do not increase the material feed or current

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.