Progress of the Phase II ammonia synthesis project at Ruixing

2016-12-26View Original

Thread Content

Progress of the Ruixing Phase II Ammonia Synthesis Project 2016-12-23 On December 23, 2016, it was learned that the on-site construction of the pipes and instruments for the boiler, air separation unit, and gasification unit in the Ruixing Phase II Ammonia Synthesis Project, which is under the responsibility of Aerospace Engineering, has been completed. Equipment commissioning and control system calibration are currently being carried out in an orderly manner. Ruixing Group is a **-level high-tech enterprise; it began collaborating with aerospace engineering in 2009 on powder gasification projects. Phase II of Ruixing will add 600,000 tons of capacity for advanced ammonia synthesis, while phasing out 300,000 tons of outdated production capacity. http://www.chinacoalchem.com/news.asp?id=61677
Reply #22016-12-26
The speed is quite fast; when I went there last year, the equipment was still under production. .
Reply #32016-12-28
Should the building owner consider an energy-saving upgrade for the reciprocating compressor?

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.