HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

7 What are the precautions for a trial lift before carrying out a lifting operation?

2023-07-13View Original

Thread Content

7 What are the precautions for a trial lift before carrying out a lifting operation?
Reply #22023-07-13
Precautions to be checked before lifting operations include: 1. Lifting operators (commanders/operators) must hold valid certificates, and the lifting equipment must pass corresponding inspections; 2. Conduct safety checks on the lifting machinery and lifting gear; 3. Set up barriers to isolate the lifting area; 4. Check the weather conditions for lifting – lifting is not allowed in case of heavy rain, thick fog, or winds of force 6 or higher; 5. Obtain the necessary lifting operation permit; 6. For lifting loads exceeding 10 tons, as well as large and irregular items to be lifted, a work plan should be prepared ; 7. The lifting height for testing should be 10–20 cm, with a duration of 1–2 minutes.
Reply #32023-07-13
GB30871 provides very detailed information; in addition, AQ 3021 can also be referred to
Reply #42023-07-13
The summary is excellent; President Liu has extensive experience

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.