How often should the welds of the high-temperature, high-pressure main steam pipes in power plants be thoroughly inspected?

2017-03-05View Original

Thread Content

This post was last edited by zhaoqingsheng on 2017-3-13 at 15:24. Question: How often should the welds in the main steam pipes of thermal power plants be thoroughly inspected? Are all welds to be inspected? Or should only some of the welds be sampled for inspection? What specific tests need to be done? What are the standards in this regard? What is the inspection cycle, in years? Before inspection, is it necessary to remove the insulation from the main steam pipeline entirely? What kind of institution can conduct such tests? What qualifications are required for a testing laboratory? Additionally, the location of welds needs to be marked outside the insulation layer. What standard should be used for these marking symbols indicating the weld locations?
Reply #22017-03-05
It’s the same as the annual inspection for industrial pipelines
Reply #32017-03-05
I have been in contact with too many power plants, and not many of them are inspected every year

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.