HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Regarding who is responsible for preparing the welding procedure qualification and whether substitution is allowed.

2022-04-03View Original

Thread Content

Guys, I have a question I’d like to ask.
Reply #22022-04-04
For issues with compilation, see your previous post. As for the issues related to substitutes, there are problems with the base material and wall thickness, and these cannot be explained in just a few words. However, one thing is very clear: the construction party must have proper welding procedure qualifications that meet the technical requirements.
Reply #32022-04-18
Prepared by this unit, welded by its own personnel; inspection can be entrusted to another unit. For use by this unit only; weld assessment reports from other units shall not be used.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.