HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

【Ten Years of Rapid Development in Chemical Engineering Equipment】The longest drill-and-blast tunnel in China’s oil and gas pipeline industry was completed between 1249 and 2023

2023-11-20View Original

Thread Content

Looking at the development of chemical engineering technology over the past decade, we praise the prosperity and strength of modern China. By sharing our insights, we encourage more people to participate and make things more lively. HaiChuan becomes even better with you in it. Prevention comes first, and life is of utmost importance. On November 12, 2023, the Lianhua Mountain Tunnel, the control project of the Huizhou-Haifeng pipeline project – the longest drill-and-blast tunnel under construction in China’s oil and gas pipeline industry – was successfully completed. This achievement laid a solid foundation for the operation of the entire pipeline network and set a new record for drill-and-blast tunnels used in this industry; it serves as a model for the construction of other long and large-scale pipelines in this field.   The Lianhua Mountain Tunnel is located in Huidong County, Guangdong Province. It is a key project of the Huizhou–Haifeng main route project in Guangdong and constitutes an important part of the province’s main natural gas pipeline network. The completion of the Huizhou-Haifeng trunk line project will further enhance the role of this route in connecting the eastern Guangdong region to the Guangdong-Hong Kong-Macao Greater Bay Area’s energy network, and it is of great significance for optimizing the energy structure of the eastern Guangdong region and achieving green and sustainable economic development in the area.   During the survey and design phase, taking into account factors such as the significant topographical variations, fragmented terrain, and numerous boulders in the areas around Lianhua Mountain, the Southwest Branch conducted 21 site selection attempts, developed 5 alternative design proposals, and after 4 rounds of coordination regarding pipeline locations and construction plans, arrived at a design solution tailored specifically for the Lianhua Mountain Tunnel. The Southwest Branch, considering that the Lianhua Mountain Tunnel is a long rock tunnel, designed a construction plan that utilizes the TBM method and the drill-and-blast method, as well as plans for pipeline installation, welding, and the installation of pipe supports and clamps. To ensure safe construction, the Southwest Branch developed 10 specific construction measures and conducted risk assessments, thereby ensuring precise tunnel construction and its successful completion.
Reply #22023-11-20
【Ten Years of Rapid Development in Chemical Engineering Equipment】Commissioning of the First Pilot Project for Complex Fractured-Cave Carbonate Rock Gas Storage Fields from 1250 to 2023 https://bbs.hcbbs.com/thread-5496330-1-1.html (Source: Haichuan Chemical Engineering Forum)
Reply #32023-11-21
【Ten Years of Rapid Development in Chemical Equipment】Growing bigger from 1251 to 2023! Guangxi to build a plant for producing 120 tons of caprolactam https://bbs.hcbbs.com/thread-5496350-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #42023-11-21
Looking at the decade-long development of chemical technology, praising the prosperity and strength of modern China
Reply #52023-11-21
Fish always work hard; thanks for gathering the information.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.