HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

The issue of openings in pipelines

2025-02-28View Original

Thread Content

I would like to ask the experienced experts on this forum: Due to subsequent modifications, the safety valve and the drain pipe are positioned opposite each other in the methanol pipeline bypass. Is this in compliance with the regulatory requirements? Please give your advice
Reply #22025-03-04
Standard reducer fittings are used; if welding is done with direct hole drilling, reinforcement calculations for the holes are required.
Reply #32025-03-05
It’s really hard to say. Try modeling and calculating it using CAESAR2; the node distance between the two adjacent pipes can be set to 0.01 or 0.1 millimeters.
Reply #42025-03-07
This is related to stress. If it’s normal pressure, it doesn’t matter; but in the case of high pressure, it’s necessary to use a reduced-diameter tee fitting. But it’s better to stagger the opening positions for reference.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.